IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
NAICS 33992 Sporting and Athletic Goods Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0334 # 01 Y:2025 01 2025 PAY BILLS ON TIME TO AVOID LATE FEES $10,077 $0 n/a
TT0334 # 08 Y:2025 08 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,504 $60 n/a
TT0334 # 02 Y:2025 02 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,793 $70 n/a
TT0334 # 04 Y:2025 04 2025 UPGRADE CONTROLS ON COMPRESSORS $6,325 $21,000 n/a
TT0334 # 06 Y:2025 06 2025 RECOVER WASTE HEAT FROM EQUIPMENT $3,038 $5,000 n/a
TT0334 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,719 $765 n/a
TT0334 # 09 Y:2025 09 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $303 $435 n/a
TT0334 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,367 $1,185 n/a
TT0334 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,948 $33,315 n/a
IP0198 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $108 $0 Implemented
IP0198 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $534 $585 Not Implemented
IP0198 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $447 $356 Implemented
IP0198 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,639 $3,266 Implemented
IP0198 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,101 $1,322 Not Implemented
IP0198 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $564 $170 Implemented
UU0205 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,310 $28,263 Not Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UU0205 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $10,629 Not Implemented
UU0205 # 04 Y:2022 04 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,404 $9,200 Not Implemented
UU0205 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $10,548 $18,900 Not Implemented
UU0205 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $720 Not Implemented
UU0205 # 06 Y:2022 06 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,070 $150 Not Implemented
AS0514 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,545 $141,340 Not Implemented
AS0514 # 03 Y:2022 03 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,435 $4,628 Not Implemented
AS0514 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,222 $8,635 Not Implemented