Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsNAICS | 33992 | Sporting and Athletic Goods Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0205 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,293 | $198 | Implemented |
UF0537 # 06 Y:2019 | 06 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,428 | $500 | Implemented |
UF0537 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,091 | $8,377 | Implemented |
UF0537 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,046 | $914 | Implemented |
UF0537 # 09 Y:2019 | 09 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,600 | $100,000 | Implemented |
UA0214 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,118 | $50 | Implemented |
UA0214 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,824 | $6,704 | Implemented |
UA0214 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $57,024 | $7,375 | Implemented |
UA0214 # 09 Y:2019 | 09 | 2019 | PAY UTILITY BILLS ON TIME | $9,417 | $0 | Implemented |
UA0214 # 04 Y:2019 | 04 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,099 | $7,241 | Implemented |
UA0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,341 | $8,495 | Implemented |
UA0214 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,674 | $35,762 | Implemented |
OK1008 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,328 | $2,128 | Implemented |
OK1008 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,069 | $0 | Implemented |
OK1008 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $107,652 | $264,795 | Implemented |
OR0690 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,285 | $2,321 | Implemented |
AM0716 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $380 | $0 | Implemented |
AM0716 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $320 | $11 | Implemented |
AM0716 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $385 | $200 | Implemented |
AM0716 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $660 | $550 | Implemented |
OK0939 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $269 | $0 | Implemented |
OK0939 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,199 | $1,105 | Implemented |
OK0939 # 06 Y:2016 | 06 | 2016 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,761 | $0 | Implemented |
AM0681 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $364 | $182 | Implemented |
AM0681 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $1,240 | Implemented |