IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
NAICS 33992 Sporting and Athletic Goods Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0373 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,349 $2,000 Not Implemented
BD0373 # 06 Y:2010 06 2010 USE RADIANT HEATER FOR SPOT HEATING $40,661 $54,000 Not Implemented
BD0373 # 07 Y:2010 07 2010 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,064 $3,000 Not Implemented
BD0372 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,215 $108,017 Not Implemented
BD0372 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,103 $5,475 Not Implemented
BD0372 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $1,532 $490 Not Implemented
BD0372 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $800 Not Implemented
BD0372 # 05 Y:2010 05 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,363 $4,400 Not Implemented
BD0372 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,914 $5,000 Implemented
BD0372 # 07 Y:2010 07 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $55,206 $9,400 Not Implemented
LE0285 # 01 Y:2009 01 2009 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $146,916 $900,000 Not Implemented
LE0285 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $12,507 $5,000 Not Implemented
LE0285 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,666 $200 Not Implemented
LE0285 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,646 $2,000 Not Implemented
LE0285 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,999 $12,000 Not Implemented
LE0285 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,792 $800 Not Implemented
LE0285 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,391 $50 Implemented
LE0285 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,389 $1,525 Implemented
LE0285 # 09 Y:2009 09 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $668 $900 Not Implemented
UM0349 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,327 $1,000 Implemented
UM0349 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $5,172 $1,840 Implemented
UM0349 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,531 $3,168 Implemented
UM0349 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $100 Implemented
UU0065 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $4,060 $5,520 Not Implemented
UU0065 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,450 $0 Implemented