Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161
matching recommendationsNAICS | 339920 | Sporting and Athletic Goods Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0198 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $108 | $0 | n/a |
IP0198 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $564 | $170 | n/a |
IP0198 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $534 | $585 | n/a |
IP0198 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $447 | $356 | n/a |
IP0198 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,101 | $1,322 | n/a |
IP0198 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,639 | $3,266 | n/a |
UU0205 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $382 | $720 | Not Implemented |
UU0205 # 06 Y:2022 | 06 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,070 | $150 | Not Implemented |
UU0205 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $10,548 | $18,900 | Not Implemented |
UU0205 # 04 Y:2022 | 04 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,404 | $9,200 | Not Implemented |
UU0205 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,629 | $10,629 | Not Implemented |
UU0205 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,293 | $198 | Implemented |
UU0205 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,310 | $28,263 | Not Implemented |
AS0514 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $772 | $59 | Not Implemented |
AS0514 # 05 Y:2022 | 05 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $7,266 | $30,762 | Not Implemented |
AS0514 # 06 Y:2022 | 06 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,883 | $1,160 | Not Implemented |
AS0514 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $799 | $1,584 | Not Implemented |
AS0514 # 09 Y:2022 | 09 | 2022 | INSTALL OCCUPANCY SENSORS | $498 | $216 | Not Implemented |
AS0514 # 01 Y:2022 | 01 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $138,858 | $8,368 | Not Implemented |
AS0514 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,545 | $141,340 | Not Implemented |
AS0514 # 03 Y:2022 | 03 | 2022 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $9,435 | $4,628 | Not Implemented |
AS0514 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,222 | $8,635 | Not Implemented |
CL2012 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,598 | $22,698 | Not Implemented |
CL2012 # 03 Y:2020 | 03 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $16,920 | $0 | Not Implemented |
CL2012 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $770 | $0 | Not Implemented |