IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
NAICS 339920 Sporting and Athletic Goods Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0648 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,544 $18,524 Implemented
AM0648 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,230 $500 Implemented
AM0648 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $2,016 $0 Implemented
AM0648 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $9 Implemented
AM0648 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $101 $308 Not Implemented
BS0006 # 01 Y:2012 01 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,105 $10,500 Not Implemented
BS0006 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $698 $90 Implemented
BS0006 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,588 $11,386 Not Implemented
BS0006 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $290 Not Implemented
IA0455 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,148 $1,000 Implemented
IA0455 # 02 Y:2010 02 2010 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,026 $620 Not Implemented
IA0455 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $562 $14 Implemented
IA0455 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,132 $14 Not Implemented
IA0455 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,112 $240 Implemented
IA0455 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,817 $3,837 Not Implemented
IA0455 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $165 $112 Implemented
IA0455 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $6,632 $9,702 Implemented
IA0455 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,331 $3,960 Implemented
IA0455 # 10 Y:2010 10 2010 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $28,440 $1,320 Not Implemented
IA0455 # 11 Y:2010 11 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,067 $2,556 Not Implemented
IA0455 # 12 Y:2010 12 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,138 $4,417 Implemented
BD0373 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,308 $48,175 Not Implemented
BD0373 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $2,326 $2,100 Not Implemented
BD0373 # 03 Y:2010 03 2010 USE PHOTOCELL CONTROLS $1,390 $3,600 Not Implemented
BD0373 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $800 Not Implemented