Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 33993 | Doll, Toy, and Game Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0798 # 09 Y:2019 | 09 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $512 | $200 | Implemented |
MA0798 # 08 Y:2019 | 08 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $922 | $978 | Not Implemented |
MA0798 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,849 | $2,001 | Implemented |
MA0798 # 06 Y:2019 | 06 | 2019 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,585 | $500 | Not Implemented |
MA0798 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $3,333 | $1,801 | Implemented |
MA0798 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,904 | $2,765 | Not Implemented |
MA0798 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,569 | $8,930 | Not Implemented |
MA0798 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,484 | $80,000 | Implemented |
MA0798 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,625 | $48,500 | Implemented |
MZ0199 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,508 | $440 | Not Implemented |
MZ0199 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,470 | $116,250 | Not Implemented |
MZ0199 # 02 Y:2015 | 02 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $19,376 | $2,500 | Not Implemented |
MZ0199 # 01 Y:2015 | 01 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $14,201 | $28,800 | Not Implemented |
MZ0199 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $20 | Not Implemented |
MZ0199 # 06 Y:2015 | 06 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,502 | $27,000 | Not Implemented |
CO0646 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,270 | $62,380 | Not Implemented |
CO0646 # 08 Y:2011 | 08 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $150 | $40 | Implemented |
CO0646 # 07 Y:2011 | 07 | 2011 | INSTALL WIND POWERED ELECTRIC GENERATOR | $270 | $5,260 | Not Implemented |
CO0646 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,340 | $2,730 | Implemented |
CO0646 # 05 Y:2011 | 05 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,910 | $35,000 | Not Implemented |
CO0646 # 04 Y:2011 | 04 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,080 | $14,690 | Not Implemented |
CO0646 # 03 Y:2011 | 03 | 2011 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,120 | $10,000 | Implemented |
CO0646 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,270 | $7,320 | Not Implemented |
WV0368 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $181 | $60 | Implemented |
WV0368 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $11,312 | $2,971 | Implemented |