IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 339930 Doll, Toy, and Game Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0360 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $48,535 $170,000 Not Implemented
WV0360 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,426 $900 Implemented
WV0360 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $300 Implemented
WV0360 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $25 Implemented
WV0360 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,676 $3,700 Implemented
WV0360 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,158 $400 Not Implemented
WV0360 # 06 Y:2007 06 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,399 $1,000 Implemented
WV0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $5,516 $1,900 Implemented
WV0360 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,938 $700 Implemented
WV0360 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,939 $70,000 Not Implemented
WV0360 # 02 Y:2007 02 2007 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $44,169 $15,000 Not Implemented
WV0273 # 01 Y:2003 01 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,403 $990 Implemented
WV0273 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $134 $285 Not Implemented
WV0273 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $166 $45 Implemented
WV0273 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $262 $875 Implemented
WV0273 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $464 $0 Implemented
WV0273 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $952 $540 Implemented
WV0273 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $994 $93 Implemented
WV0273 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $250 Implemented
WV0273 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,375 $104 Implemented
WV0273 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,583 $2,225 Not Implemented
WV0273 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,761 $1,000 Implemented