IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 339950 Sign Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0201 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,184 $41,193 Not Implemented
MI0201 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,322 $1,275 Not Implemented
MI0201 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $1,210 Not Implemented
MI0201 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,900 $40 Implemented
MI0201 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,894 $2,200 Implemented
UA0055 # 01 Y:2010 01 2010 USE OPTIMUM TEMPERATURE $30,674 $1,072 Implemented
UA0055 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $12,398 $1,602 Not Implemented
UA0055 # 03 Y:2010 03 2010 USE MINIMUM SAFE OVEN VENTILATION $4,422 $990 Not Implemented
UA0055 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $14,550 $5,020 Not Implemented
UA0055 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $3,444 $1,970 Not Implemented
UA0055 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $640 Not Implemented
UA0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,014 $1,500 Implemented
UA0055 # 08 Y:2010 08 2010 USE PHOTOCELL CONTROLS $983 $354 Not Implemented
UA0055 # 09 Y:2010 09 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $341 $106 Not Implemented
UA0055 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $559 $387 Not Implemented
UA0055 # 11 Y:2010 11 2010 DISCONNECT BALLASTS $123 $80 Implemented
UA0055 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $114 $250 Not Implemented
AM0561 # 01 Y:2009 01 2009 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,545 $38,430 Not Implemented
AM0561 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $680 Implemented
AM0561 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $3,200 $11,050 Not Implemented
AM0561 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $15 Implemented
AM0561 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $705 $300 Implemented
AM0561 # 06 Y:2009 06 2009 PAY BILLS ON TIME TO AVOID LATE FEES $452 $0 Implemented
AM0561 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,025 $535 Implemented
UA0006 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $112 $36 Not Implemented