IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0442 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,700 $21 Implemented
AM0442 # 05 Y:2003 05 2003 KEEP BOILER TUBES CLEAN $4,500 $500 Implemented
AM0442 # 06 Y:2003 06 2003 REPAIR AND ELIMINATE STEAM LEAKS $3,600 $1,000 Implemented
AM0442 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $500 Implemented
AM0442 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $2,640 $650 Implemented
AM0442 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $1,200 Implemented
AM0442 # 10 Y:2003 10 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $200 $50 Implemented
SD0321 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,855 $44,000 Not Implemented
SD0321 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $10,234 $0 Implemented
SD0321 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,011 $2,300 Not Implemented
SD0321 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,845 $0 Not Implemented
SD0321 # 05 Y:2003 05 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,842 $5,400 Not Implemented
SD0321 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $1,476 $582 Not Implemented
SD0321 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,000 $5,000 Not Implemented
MA0532 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $67,039 $7,300 Implemented
MA0532 # 02 Y:2003 02 2003 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $38,956 $84,895 Not Implemented
MA0532 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,833 $0 Implemented
MA0532 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,606 $4,400 Implemented
MA0532 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,385 $4,400 Implemented
MA0532 # 06 Y:2003 06 2003 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,627 $1,845 Implemented
MA0532 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,580 $0 Implemented
MA0532 # 08 Y:2003 08 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $520 $0 Not Implemented
SD0315 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $85,538 $80,000 Not Implemented
SD0315 # 02 Y:2003 02 2003 ISOLATE HOT OR COLD EQUIPMENT $30,227 $5,000 Not Implemented
SD0315 # 03 Y:2003 03 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,751 $56 Implemented