Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 33999 | All Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0032 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,263 | $0 | Implemented |
IP0032 # 03 Y:2014 | 03 | 2014 | USE SOLAR HEAT TO HEAT WATER | $69,019 | $314,300 | Not Implemented |
IP0032 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $659 | $556 | Implemented |
IP0032 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,644 | $16,018 | Implemented |
IP0030 # 02 Y:2014 | 02 | 2014 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $5,730 | $124 | Implemented |
IP0030 # 09 Y:2014 | 09 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,765 | $116,486 | Not Implemented |
IP0030 # 08 Y:2014 | 08 | 2014 | USE PHOTOCELL CONTROLS | $406 | $1,181 | Not Implemented |
IP0030 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $685 | $380 | Not Implemented |
IP0030 # 01 Y:2014 | 01 | 2014 | INSTALL SET-BACK TIMERS | $4,377 | $35 | Implemented |
IP0030 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,493 | $280 | Implemented |
IP0030 # 04 Y:2014 | 04 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,369 | $746 | Not Implemented |
IP0030 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $442 | $227 | Implemented |
IP0030 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,951 | $1,300 | Not Implemented |
WV0485 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $5,211 | $2,981 | Implemented |
WV0485 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,703 | $500 | Implemented |
WV0485 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,806 | $4,815 | Not Implemented |
WV0485 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,038 | $175 | Implemented |
WV0485 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $2,805 | $3,000 | Implemented |
WV0485 # 09 Y:2014 | 09 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,922 | $1,719 | Not Implemented |
WV0485 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,635 | $4,433 | Not Implemented |
WV0485 # 11 Y:2014 | 11 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,516 | $696 | Implemented |
WV0485 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $691 | $426 | Implemented |
WV0485 # 03 Y:2014 | 03 | 2014 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $5,371 | $10,550 | Not Implemented |
WV0485 # 02 Y:2014 | 02 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $9,166 | $12,500 | Not Implemented |
WV0485 # 01 Y:2014 | 01 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,434 | $1,000 | Not Implemented |