IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 339999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0572 # 10 Y:2025 10 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $29,664 $180,240 n/a
SU0572 # 09 Y:2025 09 2025 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $167 $359 n/a
SU0572 # 08 Y:2025 08 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,746 $5,006 n/a
SU0572 # 07 Y:2025 07 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $673 $691 n/a
SU0572 # 06 Y:2025 06 2025 INSULATE BARE EQUIPMENT $813 $771 n/a
SU0572 # 05 Y:2025 05 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,035 $65 n/a
SU0572 # 04 Y:2025 04 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $144 $0 n/a
SU0572 # 03 Y:2025 03 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,576 $0 n/a
SU0572 # 02 Y:2025 02 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,651 $0 n/a
SU0572 # 01 Y:2025 01 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,783 $0 n/a
SU0501 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $557 $20 Not Implemented
SU0501 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $273 $882 Not Implemented
SU0501 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $999 Not Implemented
SU0501 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $2,583 $2,772 Not Implemented
SU0501 # 02 Y:2020 02 2020 DISCONNECT BALLASTS $919 $180 Not Implemented
SU0199 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $7,434 $2,000 Implemented
SU0199 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $11,792 $1,184 Not Implemented
SU0199 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $371,280 $13,500 Implemented
SU0199 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,830 $0 Not Implemented
SU0199 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $144 $0 Implemented
SU0193 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,858 $0 Implemented
SU0193 # 09 Y:2004 09 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,340 $10,000 Not Implemented
SU0193 # 08 Y:2004 08 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,989 $10,421 Implemented
SU0193 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $2,415 Not Implemented
SU0193 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $489 $304 Implemented