Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsNAICS | 423 | Merchant Wholesalers, Durable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0025 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,914 | $5,609 | Implemented |
NT0025 # 04 Y:2024 | 04 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,410 | $21,995 | Implemented |
NT0025 # 06 Y:2024 | 06 | 2024 | CHANGE OPERATING CONDITIONS | $150,000 | $1,200,000 | Implemented |
NT0025 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,136 | $0 | Implemented |
UD1077 # 02 Y:2024 | 02 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,002 | $25,200 | Implemented |
LE0552 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,712 | $2,500 | Implemented |
LE0552 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $790 | $570 | Implemented |
LE0552 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $100 | Implemented |
LE0552 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $231 | $320 | Implemented |
LE0552 # 09 Y:2023 | 09 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,062 | $48,000 | Implemented |
CI0010 # 06 Y:2023 | 06 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,125 | $50 | Implemented |
CI0010 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,279 | $12,078 | Implemented |
CI0010 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,459 | $115,417 | Implemented |
LE0538 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,366 | $2,000 | Implemented |
LE0538 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,576 | $4,000 | Implemented |
LE0538 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,166 | $4,521 | Implemented |
LE0538 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $2,500 | Implemented |
LE0538 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $3,047 | $0 | Implemented |
AS0533 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $291 | $600 | Implemented |
AS0533 # 03 Y:2022 | 03 | 2022 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $11,409 | $630 | Implemented |
AS0533 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,662 | $30,425 | Implemented |
IC0248 # 02 Y:2021 | 02 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,744 | $0 | Implemented |
IC0248 # 04 Y:2021 | 04 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $724 | $712 | Implemented |
IC0248 # 05 Y:2021 | 05 | 2021 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,297 | $0 | Implemented |
IC0217 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,967 | $7,769 | Implemented |