IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
NAICS 423 Merchant Wholesalers, Durable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0818 # 11 Y:2010 11 2010 INSTALL AUTOMATIC STACK DAMPER $4,241 $0 Not Implemented
UD0818 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $3,887 $0 Not Implemented
UD0818 # 13 Y:2010 13 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,977 $0 Not Implemented
UD0818 # 14 Y:2010 14 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $29,159 $0 Not Implemented
UD0818 # 15 Y:2010 15 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,060 $0 Implemented
UD0818 # 16 Y:2010 16 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,929 $0 Implemented
UW0034 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $120,000 $0 Not Implemented
UW0034 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,639 $102,000 Implemented
UW0034 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,716 $0 Not Implemented
UW0034 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,749 $115,000 Implemented
UW0034 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,077 $10,000 Implemented
IC0167 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,950 $19,296 Not Implemented
IC0167 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,522 $458 Implemented
IC0167 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,193 $0 Implemented
IC0167 # 04 Y:2009 04 2009 REPAIR AND ELIMINATE STEAM LEAKS $875 $400 Implemented
IC0167 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,524 $1,260 Implemented
IC0167 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $137 $115 Implemented
IC0167 # 07 Y:2009 07 2009 UPGRADE CONTROLS ON COMPRESSORS $3,067 $8,134 Implemented
IC0167 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $452 $0 Not Implemented
DL0042 # 01 Y:2009 01 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,756 $0 Implemented
DL0042 # 02 Y:2009 02 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,180 $19,200 Not Implemented
DL0042 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,200 $1,760 Implemented
DL0042 # 04 Y:2009 04 2009 ADD AREA LIGHTING SWITCHES $11,009 $1,325 Not Implemented
DL0042 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,332 $368 Not Implemented
DL0042 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $500 Not Implemented