IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 4233 Lumber and Other Construction Materials Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0538 # 11 Y:2023 11 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,629 $46,896 Not Implemented
LE0538 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $459 $1,341 Not Implemented
LE0538 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,125 $18,761 Not Implemented
LE0538 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $2,000 Implemented
LE0538 # 07 Y:2023 07 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $49,716 $58,635 Not Implemented
LE0538 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,166 $4,521 Implemented
LE0538 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,576 $4,000 Implemented
LE0538 # 04 Y:2023 04 2023 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,452 $1,992 Not Implemented
LE0538 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,256 $2,500 Implemented
LE0538 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,656 $1,200 Not Implemented
LE0538 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $3,047 $0 Implemented
UW0034 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,077 $10,000 Implemented
UW0034 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,749 $115,000 Implemented
UW0034 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,716 $0 Not Implemented
UW0034 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,639 $102,000 Implemented
UW0034 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $120,000 $0 Not Implemented
NC0318 # 01 Y:2005 01 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $39,375 $1,000 Implemented
NC0318 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $108 $250 Implemented
NC0318 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $244 $100 Implemented
NC0318 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,927 $5,332 Not Implemented
NC0318 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $443 $585 Implemented
NC0318 # 03 Y:2005 03 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,275 $18,500 Not Implemented
NC0318 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $11,668 $20,000 Implemented