Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 424 | Merchant Wholesalers, Nondurable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1022 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $270 | Implemented |
LS1022 # 02 Y:2022 | 02 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,565 | $88 | Implemented |
LS1022 # 01 Y:2022 | 01 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $1,456 | $0 | Implemented |
BS0152 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $71,968 | $162,000 | Not Implemented |
BS0152 # 04 Y:2021 | 04 | 2021 | INSTALL OCCUPANCY SENSORS | $60,903 | $7,355 | Not Implemented |
BS0152 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $414 | Not Implemented |
BS0152 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,503 | $8,301 | Not Implemented |
BS0152 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,594 | $114,156 | Not Implemented |
BS0126 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $308 | $53 | Not Implemented |
BS0126 # 04 Y:2019 | 04 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,406 | $13,000 | Not Implemented |
BS0126 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $130 | $20 | Not Implemented |
BS0126 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,569 | $1,440 | Not Implemented |
NL0009 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $691 | $3,360 | Implemented |
NL0009 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,632 | $4,788 | Implemented |
NL0009 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,263 | $10,000 | Not Implemented |
NL0009 # 01 Y:2017 | 01 | 2017 | REDESIGN PROCESS | $37,689 | $38,000 | Not Implemented |
SU0372 # 04 Y:2014 | 04 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $848 | $136 | Not Implemented |
SU0372 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $849 | $590 | Not Implemented |
SU0372 # 03 Y:2014 | 03 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,896 | $380 | Not Implemented |
SU0372 # 02 Y:2014 | 02 | 2014 | DISCONNECT BALLASTS | $285 | $0 | Not Implemented |
SU0372 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,101 | $0 | Not Implemented |
SU0372 # 07 Y:2014 | 07 | 2014 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $305 | $720 | Not Implemented |
SU0372 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $330 | $365 | Implemented |
SU0372 # 08 Y:2014 | 08 | 2014 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $20,087 | $56,082 | Not Implemented |
BD0431 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $12,000 | $1,000 | Implemented |