Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
190
matching recommendationsNAICS | 424 | Merchant Wholesalers, Nondurable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0105 # 06 Y:2013 | 06 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,400 | $590 | Not Implemented |
DL0105 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,200 | $2,300 | Not Implemented |
DL0105 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,000 | $80 | Implemented |
DL0105 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,350 | $3,200 | Not Implemented |
DL0105 # 10 Y:2013 | 10 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $154,000 | $1,000,000 | Implemented |
DL0105 # 11 Y:2013 | 11 | 2013 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $82,900 | $420,000 | Implemented |
OR0599 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,611 | $12,467 | Implemented |
OR0599 # 02 Y:2012 | 02 | 2012 | INSTALL AUTOMATIC PACKING EQUIPMENT | $35,308 | $0 | Implemented |
OR0599 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,422 | $0 | Not Implemented |
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
OR0599 # 05 Y:2012 | 05 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,964 | $17,576 | Not Implemented |
SU0308 # 01 Y:2011 | 01 | 2011 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $8,509 | $0 | Not Implemented |
SU0308 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,204 | $698 | Implemented |
SU0308 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $8,338 | $1,725 | Not Implemented |
SU0308 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,713 | $625 | Implemented |
SU0308 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $628 | $641 | Not Implemented |
SU0308 # 06 Y:2011 | 06 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,654 | $27,750 | Not Implemented |
MI0185 # 01 Y:2009 | 01 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,100 | $64,000 | Not Implemented |
MI0185 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $83,014 | $1,500 | Implemented |
MI0185 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,375 | $60 | Implemented |
MI0185 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,482 | $920 | Implemented |
MI0185 # 05 Y:2009 | 05 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $12,330 | $800 | Implemented |
MI0185 # 06 Y:2009 | 06 | 2009 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,182 | $640 | Implemented |
OR0538 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $113,818 | $1,600 | Not Implemented |
OR0538 # 02 Y:2008 | 02 | 2008 | USE OPTIMUM THICKNESS INSULATION | $15,451 | $3,248 | Not Implemented |