Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 424 | Merchant Wholesalers, Nondurable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0328 # 09 Y:2007 | 09 | 2007 | MINIMIZE WATER USAGE | $1,171 | $4,000 | Not Implemented |
WV0313 # 01 Y:2005 | 01 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $94,235 | $1,000 | Implemented |
WV0313 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,522 | $10,250 | Not Implemented |
WV0313 # 03 Y:2005 | 03 | 2005 | OPERATE BOILERS ON HIGH FIRE SETTING | $27,626 | $5,110 | Not Implemented |
WV0313 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $21,789 | $110 | Not Implemented |
WV0313 # 05 Y:2005 | 05 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $15,992 | $3,200 | Implemented |
WV0313 # 06 Y:2005 | 06 | 2005 | MINIMIZE WATER USAGE | $14,331 | $13,600 | Not Implemented |
WV0313 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,376 | $900 | Implemented |
WV0313 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $4,952 | $1,322 | Implemented |
WV0313 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,756 | $1,320 | Implemented |
WV0313 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,479 | $110 | Implemented |
WV0313 # 11 Y:2005 | 11 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,420 | $1,000 | Implemented |
WV0313 # 12 Y:2005 | 12 | 2005 | USE SYNTHETIC LUBRICANT | $2,220 | $620 | Implemented |
WV0313 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,101 | $0 | Not Implemented |
WV0313 # 14 Y:2005 | 14 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,447 | $1,050 | Not Implemented |
OR0477 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $240,000 | $250,000 | Not Implemented |
OR0477 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $34,000 | $34,000 | Not Implemented |
OR0477 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,455 | $11,500 | Implemented |
OR0477 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $3,100 | Implemented |
OR0477 # 05 Y:2005 | 05 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $14,995 | $1,875 | Implemented |
OR0477 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $13,416 | $25,000 | Implemented |
OR0477 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $29,545 | $182,000 | Not Implemented |
OR0477 # 08 Y:2005 | 08 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,200 | $0 | Implemented |
OR0477 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,870 | $84,875 | Not Implemented |
BD0257 # 01 Y:2004 | 01 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $43,626 | $5,040 | Implemented |