Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 424 | Merchant Wholesalers, Nondurable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0313 # 03 Y:2005 | 03 | 2005 | OPERATE BOILERS ON HIGH FIRE SETTING | $27,626 | $5,110 | Not Implemented |
WV0313 # 14 Y:2005 | 14 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,447 | $1,050 | Not Implemented |
WV0313 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,101 | $0 | Not Implemented |
WV0313 # 12 Y:2005 | 12 | 2005 | USE SYNTHETIC LUBRICANT | $2,220 | $620 | Implemented |
WV0313 # 11 Y:2005 | 11 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,420 | $1,000 | Implemented |
WV0313 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,479 | $110 | Implemented |
WV0313 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,756 | $1,320 | Implemented |
WV0313 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $4,952 | $1,322 | Implemented |
WV0313 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,376 | $900 | Implemented |
WV0313 # 06 Y:2005 | 06 | 2005 | MINIMIZE WATER USAGE | $14,331 | $13,600 | Not Implemented |
WV0313 # 05 Y:2005 | 05 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $15,992 | $3,200 | Implemented |
WV0313 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $21,789 | $110 | Not Implemented |
WV0313 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,522 | $10,250 | Not Implemented |
WV0313 # 01 Y:2005 | 01 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $94,235 | $1,000 | Implemented |
OR0477 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $240,000 | $250,000 | Not Implemented |
OR0477 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,870 | $84,875 | Not Implemented |
OR0477 # 08 Y:2005 | 08 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,200 | $0 | Implemented |
OR0477 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $29,545 | $182,000 | Not Implemented |
OR0477 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $13,416 | $25,000 | Implemented |
OR0477 # 05 Y:2005 | 05 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $14,995 | $1,875 | Implemented |
OR0477 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $3,100 | Implemented |
OR0477 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,455 | $11,500 | Implemented |
OR0477 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $34,000 | $34,000 | Not Implemented |