IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 4246 Chemical and Allied Products Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0105 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $54,800 $200 Not Implemented
DL0105 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,200 $13,500 Implemented
DL0105 # 11 Y:2013 11 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $82,900 $420,000 Implemented
DL0105 # 10 Y:2013 10 2013 USE RADIANT HEATER FOR SPOT HEATING $154,000 $1,000,000 Implemented
DL0105 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,350 $3,200 Not Implemented
DL0105 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,000 $80 Implemented
DL0105 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,200 $2,300 Not Implemented
DL0105 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,400 $590 Not Implemented
DL0105 # 05 Y:2013 05 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $16,300 $500 Not Implemented
DL0105 # 04 Y:2013 04 2013 ADD AREA LIGHTING SWITCHES $18,950 $1,400 Implemented
DL0105 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $20,300 $8,000 Not Implemented
WV0313 # 14 Y:2005 14 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,447 $1,050 Not Implemented
WV0313 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,101 $0 Not Implemented
WV0313 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $2,220 $620 Implemented
WV0313 # 11 Y:2005 11 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,420 $1,000 Implemented
WV0313 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,479 $110 Implemented
WV0313 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $3,756 $1,320 Implemented
WV0313 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,952 $1,322 Implemented
WV0313 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,376 $900 Implemented
WV0313 # 06 Y:2005 06 2005 MINIMIZE WATER USAGE $14,331 $13,600 Not Implemented
WV0313 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $15,992 $3,200 Implemented
WV0313 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $21,789 $110 Not Implemented
WV0313 # 03 Y:2005 03 2005 OPERATE BOILERS ON HIGH FIRE SETTING $27,626 $5,110 Not Implemented
WV0313 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,522 $10,250 Not Implemented
WV0313 # 01 Y:2005 01 2005 REPAIR OR REPLACE STEAM TRAPS $94,235 $1,000 Implemented