IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 4248 Beer, Wine, and Distilled Alcoholic Beverage Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0227 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,298 $0 Implemented
DL0227 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,653 $0 Implemented
DL0227 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,027 $552 Not Implemented
DL0227 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $6,362 $0 Implemented
DL0227 # 05 Y:2023 05 2023 USE RADIANT HEATER FOR SPOT HEATING $3,640 $10,608 Not Implemented
DL0227 # 06 Y:2023 06 2023 INSTALL TIMERS AND/OR THERMOSTATS $5,836 $30,292 Implemented
BS0152 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,503 $8,301 Not Implemented
BS0152 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $414 Not Implemented
BS0152 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $60,903 $7,355 Not Implemented
BS0152 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $71,968 $162,000 Not Implemented
BS0152 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,594 $114,156 Not Implemented
MI0185 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,482 $920 Implemented
MI0185 # 06 Y:2009 06 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,182 $640 Implemented
MI0185 # 05 Y:2009 05 2009 REPAIR OR REPLACE STEAM TRAPS $12,330 $800 Implemented
MI0185 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,375 $60 Implemented
MI0185 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $83,014 $1,500 Implemented
MI0185 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $123,100 $64,000 Not Implemented
BD0257 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $43,626 $5,040 Implemented
BD0257 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,732 $36,505 Not Implemented
BD0257 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,533 $2,160 Not Implemented
BD0257 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,777 $500 Implemented
BD0257 # 05 Y:2004 05 2004 INSTALL TURBULATORS $5,680 $1,200 Implemented
BD0257 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,187 $2,000 Implemented
BD0257 # 07 Y:2004 07 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,979 $0 Implemented
BD0257 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $500 Implemented