IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 488 Support Activities for Transportation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0557 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,169 $2,419 Implemented
AS0557 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,986 $19,728 Implemented
AS0557 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,118 $160 Not Implemented
AS0557 # 05 Y:2023 05 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $333 $284 Implemented
AS0557 # 06 Y:2023 06 2023 MINIMIZE WATER USAGE $233 $30 Not Implemented
AS0557 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $46 $294 Implemented
AS0557 # 01 Y:2023 01 2023 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,610 $960 Not Implemented
MS0416 # 01 Y:2023 01 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $252 $959 n/a
MS0416 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,534 $30,450 n/a
MS0416 # 03 Y:2023 03 2023 REPLACE BOILER $3,245 $25,658 n/a
MS0416 # 05 Y:2023 05 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $451 $0 n/a
MS0416 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,420 $0 n/a
CI0003 # 06 Y:2022 06 2022 USE PHOTOCELL CONTROLS $3,744 $1,166 n/a
CI0003 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,557 $25 n/a
CI0003 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $87,136 $114,800 n/a
CI0003 # 08 Y:2022 08 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,200 $500 n/a
CI0003 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $8,580 n/a
CI0003 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,546 $600 n/a
CI0003 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $16,393 $82,655 n/a
CI0003 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,448 $7,600 n/a
UF0580 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $10,501 Implemented
UF0580 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,037 $2,270 Implemented
UF0580 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $383,709 $1,629,000 Not Implemented
UF0580 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,200 $57,498 Implemented
UF0580 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $18,832 $31,696 Implemented