IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

266

matching recommendations
Reset
NAICS 511 Publishing Industries (except Internet)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0192 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,732 $4,531 Not Implemented
MI0192 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,898 $40 Implemented
MI0192 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,417 $1,020 Implemented
MI0192 # 05 Y:2010 05 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,608 $35,500 Not Implemented
MI0192 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,844 $1,210 Implemented
MI0192 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $37,971 $1,020 Implemented
MI0192 # 02 Y:2010 02 2010 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $39,832 $41,440 Not Implemented
MI0192 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,080 $32,395 Implemented
UA0046 # 07 Y:2010 07 2010 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $482 $1,500 Not Implemented
UA0046 # 06 Y:2010 06 2010 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $482 $1,000 Not Implemented
UA0046 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,794 $8,625 Not Implemented
UA0046 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,752 $1,750 Not Implemented
UA0046 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,244 $810 Implemented
UA0046 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,060 $1,500 Implemented
UA0046 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,580 $0 Not Implemented
CO0629 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,160 $1,690 Not Implemented
CO0629 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,330 $1,540 Not Implemented
CO0629 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $1,450 Not Implemented
CO0629 # 06 Y:2009 06 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,260 $3,500 Not Implemented
CO0629 # 05 Y:2009 05 2009 ADD AREA LIGHTING SWITCHES $1,530 $320 Not Implemented
CO0629 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,940 $1,400 Not Implemented
CO0629 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,070 $9,190 Not Implemented
UD0800 # 04 Y:2009 04 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,047 $0 Implemented
UD0800 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $162 $250 Implemented
UD0800 # 09 Y:2009 09 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $330 $300 Not Implemented