IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
NAICS 51111 Newspaper Publishers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0894 # 02 Y:2024 02 2024 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $735 $1,300 n/a
AM0894 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $670 $790 n/a
AM0894 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $420 $7 n/a
AM0894 # 05 Y:2024 05 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $335 $0 n/a
AM0894 # 06 Y:2024 06 2024 USE SYNTHETIC LUBRICANT $150 $100 n/a
AM0894 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $110 $55 n/a
AM0894 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $500 n/a
DL0106 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $81,500 $11,200 Not Implemented
DL0106 # 04 Y:2013 04 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $102,000 $2,375,000 Implemented
DL0106 # 03 Y:2013 03 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $58,740 $5,580 Not Implemented
DL0106 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,083 $1,516 Implemented
DL0106 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $50,820 $2,200 Implemented
UA0097 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,219 $2,500 Implemented
UA0097 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,163 $1,646 Not Implemented
UA0097 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $3,317 $299 Not Implemented
UA0097 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $10,770 $3,452 Not Implemented
UA0097 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,628 $18,309 Not Implemented
UA0097 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $11,720 $2,301 Not Implemented
MA0701 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,286 $500 Implemented
MA0701 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,785 $80,000 Not Implemented
MA0701 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $3,642 $6,000 Not Implemented
MA0701 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $12,823 $24,111 Not Implemented
MA0701 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $7,855 $11,200 Implemented
MA0701 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,553 $47,000 Implemented
MZ0074 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $81 $170 Implemented