IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
NAICS 541 Professional, Scientific, and Technical Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0202 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $0 Implemented
DL0202 # 07 Y:2021 07 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $530 $1,035 Not Implemented
DL0202 # 08 Y:2021 08 2021 RECOVER WASTE HEAT FROM EQUIPMENT $20,900 $50,000 Not Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
OR0723 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $21,541 $1,027 Not Implemented
OR0723 # 03 Y:2019 03 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,360 $1,789 Implemented
WM0104 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $64,540 $93,226 Not Implemented
WM0104 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,927 $33,500 Not Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $11,736 $45,000 Not Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $7,607 $650 Not Implemented
WM0104 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,589 $554 Not Implemented
SU0411 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,414 $0 Implemented
SU0411 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $3,422 $10,350 Implemented
SU0411 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,449 Implemented
SU0411 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $3,627 $6,660 Implemented
SU0411 # 05 Y:2016 05 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $167 $235 Implemented
SU0411 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,579 $45,826 Not Implemented
IP0054 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $329 $0 Not Implemented
IP0054 # 02 Y:2015 02 2015 PAY BILLS ON TIME TO AVOID LATE FEES $576 $0 Implemented
IP0054 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $20,367 $2,184 Not Implemented
IP0054 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $1,348 Not Implemented
IP0035 # 01 Y:2015 01 2015 INSTALL SET-BACK TIMERS $9,953 $0 Implemented
IP0035 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,501 $324 Not Implemented