IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
NAICS 541 Professional, Scientific, and Technical Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0035 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $7,258 $13,085 Not Implemented
IP0035 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $989 $2,747 Not Implemented
IP0035 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $10,513 $23,031 Not Implemented
WM0054 # 01 Y:2014 01 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,511 $0 Implemented
WM0054 # 02 Y:2014 02 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,524 $330 Implemented
WM0054 # 03 Y:2014 03 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,335 $10,000 Not Implemented
WM0054 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,363 $2,000 Not Implemented
WM0054 # 05 Y:2014 05 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $934 $0 Implemented
WM0054 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $4,048 Not Implemented
WM0054 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $720 Implemented
WM0054 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $1,764 $6,315 Not Implemented
BD0434 # 01 Y:2013 01 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $48,621 $13,862 Implemented
BD0434 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,169 $11,159 Implemented
BD0434 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $15,503 $11,000 Not Implemented
BD0434 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,463 $1,425 Implemented
BD0434 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,272 $1,475 Implemented
UM0430 # 01 Y:2013 01 2013 RECOVER MECHANICAL ENERGY $45,000 $8,000 Not Implemented
UM0430 # 02 Y:2013 02 2013 RECOVER MECHANICAL ENERGY $18,100 $15,500 Not Implemented
UM0430 # 03 Y:2013 03 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,100 $5,500 Not Implemented
UM0430 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,154 $29,153 Implemented
UM0423 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $454 $175 Implemented
UM0423 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,224 $5,550 Implemented
UM0423 # 03 Y:2013 03 2013 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,300 $6,500 Not Implemented
UM0421 # 01 Y:2013 01 2013 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $75,276 $110,000 Not Implemented
UM0421 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $494 $3,525 Implemented