Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 561 | Administrative and Support Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP7008 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $212 | $1,194 | Not Implemented |
IP7008 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,116 | $24,598 | Not Implemented |
IP7008 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,274 | $2,145 | Not Implemented |
UU0238 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,731 | $5,916 | Implemented |
UU0238 # 04 Y:2024 | 04 | 2024 | CLEAN CONDENSER TUBES | $3,894 | $3,890 | Implemented |
UU0238 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,670 | $22,500 | Not Implemented |
UU0238 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,624 | $12,621 | Implemented |
UU0238 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,223 | $4,080 | Implemented |
OR0714 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,732 | $10,902 | Not Implemented |
OR0714 # 04 Y:2019 | 04 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,441 | $23,733 | Not Implemented |
OR0714 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $21,372 | $29,440 | Not Implemented |
OR0714 # 02 Y:2019 | 02 | 2019 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $40,772 | $23,842 | Not Implemented |
OR0714 # 01 Y:2019 | 01 | 2019 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $56,799 | $168,000 | Not Implemented |
UK1506 # 06 Y:2015 | 06 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,452 | $1,000 | Implemented |
UK1506 # 05 Y:2015 | 05 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,107 | $688 | Implemented |
UK1506 # 07 Y:2015 | 07 | 2015 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $7,973 | $112 | Not Implemented |
UK1506 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,111 | $2,000 | Not Implemented |
UK1506 # 09 Y:2015 | 09 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,513 | $841 | Implemented |
UK1506 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,255 | $0 | Not Implemented |
UK1506 # 11 Y:2015 | 11 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,642 | $1,284 | Not Implemented |
UK1506 # 12 Y:2015 | 12 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $1,281 | $5,000 | Not Implemented |
UK1506 # 13 Y:2015 | 13 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $829 | $1,200 | Not Implemented |
UK1506 # 14 Y:2015 | 14 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,725 | $4,500 | Not Implemented |
UK1506 # 15 Y:2015 | 15 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,531 | $2,478 | Implemented |
UK1506 # 16 Y:2015 | 16 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $1,481 | $2,501 | Implemented |