IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 561 Administrative and Support Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP7008 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $212 $1,194 Not Implemented
IP7008 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,116 $24,598 Not Implemented
IP7008 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $2,145 Not Implemented
UU0238 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,731 $5,916 Implemented
UU0238 # 04 Y:2024 04 2024 CLEAN CONDENSER TUBES $3,894 $3,890 Implemented
UU0238 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,670 $22,500 Not Implemented
UU0238 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,624 $12,621 Implemented
UU0238 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,223 $4,080 Implemented
OR0714 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,732 $10,902 Not Implemented
OR0714 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,441 $23,733 Not Implemented
OR0714 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,372 $29,440 Not Implemented
OR0714 # 02 Y:2019 02 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,772 $23,842 Not Implemented
OR0714 # 01 Y:2019 01 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $56,799 $168,000 Not Implemented
UK1506 # 06 Y:2015 06 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,452 $1,000 Implemented
UK1506 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,107 $688 Implemented
UK1506 # 07 Y:2015 07 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,973 $112 Not Implemented
UK1506 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,111 $2,000 Not Implemented
UK1506 # 09 Y:2015 09 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,513 $841 Implemented
UK1506 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,255 $0 Not Implemented
UK1506 # 11 Y:2015 11 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,642 $1,284 Not Implemented
UK1506 # 12 Y:2015 12 2015 UPGRADE CONTROLS ON COMPRESSORS $1,281 $5,000 Not Implemented
UK1506 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $829 $1,200 Not Implemented
UK1506 # 14 Y:2015 14 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,725 $4,500 Not Implemented
UK1506 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,531 $2,478 Implemented
UK1506 # 16 Y:2015 16 2015 UPGRADE OBSOLETE EQUIPMENT $1,481 $2,501 Implemented