IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 611 Educational Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0265 # 08 Y:2025 08 2025 RECOVER WASTE HEAT FROM EQUIPMENT $545 $572 n/a
UU0265 # 01 Y:2025 01 2025 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,697 $45,926 n/a
UU0265 # 02 Y:2025 02 2025 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,450 $9,720 n/a
UU0265 # 09 Y:2025 09 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $551 n/a
UU0265 # 05 Y:2025 05 2025 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,338 $5,515 n/a
UU0265 # 03 Y:2025 03 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,938 $15,980 n/a
UU0265 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,000 $5,450 n/a
UU0265 # 04 Y:2025 04 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $1,620 $14,000 n/a
UU0265 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $546 $1,620 n/a
UU0253 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $26,630 $43,200 Not Implemented
UU0253 # 05 Y:2024 05 2024 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $150 $450 Not Implemented
UU0253 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $717 $2,200 Implemented
UU0253 # 03 Y:2024 03 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,211 $18,400 Implemented
UU0253 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,113 $26,430 Implemented
UU0245 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $299 $100 Implemented
UU0245 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,961 $3,200 Implemented
UU0245 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,693 $25,330 Not Implemented
UU0245 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,514 $18,000 Implemented
UU0233 # 04 Y:2023 04 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $425 $255 Implemented
UU0233 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,572 $850 Not Implemented
UU0233 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,200 $255 Not Implemented
UU0233 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,358 $31,190 Implemented
UU0232 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $228 $170 Not Implemented
UU0232 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $909 $425 Implemented
UU0232 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,942 $26,160 Implemented