IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 61121 Junior Colleges
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORC013 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,215 $1,500 n/a
ORC013 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,643 $49,125 n/a
ORC013 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $559 $1,200 n/a
ORC013 # 04 Y:2023 04 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $27,579 $200,000 n/a
OK1102 # 03 Y:2023 03 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $417 $470 Not Implemented
OK1102 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,376 $11,510 Not Implemented
OK1102 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $3,697 $46,170 Not Implemented
ORC011 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,565 $11,700 Not Implemented
ORC011 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $494 $2,500 Not Implemented
ORC011 # 03 Y:2023 03 2023 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $6,882 $0 Not Implemented
ORC011 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $117 $500 Not Implemented
ORC010 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,713 $12,000 Not Implemented
ORC010 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,211 $2,500 Not Implemented
ORC010 # 03 Y:2023 03 2023 REPLACE BOILER $3,391 $30,000 Not Implemented
ORC010 # 04 Y:2023 04 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $8,755 $1,000 Not Implemented
ORC010 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $16,690 $0 Implemented
ORC006 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,080 $12,000 Not Implemented
ORC006 # 04 Y:2023 04 2023 MINIMIZE WATER USAGE $1,964 $8,000 Implemented
ORC006 # 03 Y:2023 03 2023 USE OPTIMUM THICKNESS INSULATION $72 $100 Not Implemented
ORC006 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $8,470 $1,000 Not Implemented
CM1002 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $1,200 Not Implemented
CM1002 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $32,600 $850,000 Not Implemented
CM1002 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $21,000 $740,000 Implemented
CM1002 # 04 Y:2022 04 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $4,300 $3,000 Not Implemented
CM1002 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $4,100 Not Implemented