Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsNAICS | 622 | Hospitals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0338 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,077 | $3,280 | Not Implemented |
MI0338 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,126 | $12,487 | Not Implemented |
MI0338 # 03 Y:2018 | 03 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,231 | $10,979 | Not Implemented |
MI0338 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $7,395 | $10,000 | Not Implemented |
MI0338 # 05 Y:2018 | 05 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,623 | $12,700 | Not Implemented |
MI0338 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,201 | $3,628 | Not Implemented |
MI0338 # 08 Y:2018 | 08 | 2018 | USE PHOTOCELL CONTROLS | $1,130 | $1,376 | Not Implemented |
DL0175 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,500 | $144,400 | Not Implemented |
DL0175 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,617 | $180,488 | Not Implemented |
DL0175 # 03 Y:2017 | 03 | 2017 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $84,055 | $4,400 | Not Implemented |
DL0175 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,553 | $233,080 | Not Implemented |
UA0166 # 02 Y:2016 | 02 | 2016 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,491 | $80 | Implemented |
UA0166 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,753 | $1,050 | Implemented |
UA0166 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,666 | $38,071 | Implemented |
UA0166 # 06 Y:2016 | 06 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $617 | $200 | Implemented |
UA0166 # 05 Y:2016 | 05 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,707 | $120 | Implemented |
UA0166 # 04 Y:2016 | 04 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,642 | $59,120 | Not Implemented |
UA0166 # 03 Y:2016 | 03 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $26,248 | $80 | Implemented |
UA0166 # 01 Y:2016 | 01 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $93,758 | $199,325 | Not Implemented |
IA0545 # 01 Y:2015 | 01 | 2015 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $37,834 | $27,000 | Implemented |
IA0545 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,509 | $115,341 | Implemented |
IA0545 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $9,979 | $4,778 | Not Implemented |
IA0545 # 04 Y:2015 | 04 | 2015 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,172 | $620 | Implemented |
IA0545 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,267 | $4,620 | Implemented |
IA0545 # 06 Y:2015 | 06 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $231 | $292 | Implemented |