IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 622 Hospitals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0338 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $22,077 $3,280 Not Implemented
MI0338 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,126 $12,487 Not Implemented
MI0338 # 03 Y:2018 03 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,231 $10,979 Not Implemented
MI0338 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT MAKE-UP AIR $7,395 $10,000 Not Implemented
MI0338 # 05 Y:2018 05 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,623 $12,700 Not Implemented
MI0338 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $1,201 $3,628 Not Implemented
MI0338 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $1,130 $1,376 Not Implemented
DL0175 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,500 $144,400 Not Implemented
DL0175 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,617 $180,488 Not Implemented
DL0175 # 03 Y:2017 03 2017 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $84,055 $4,400 Not Implemented
DL0175 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $62,553 $233,080 Not Implemented
UA0166 # 02 Y:2016 02 2016 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,491 $80 Implemented
UA0166 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,753 $1,050 Implemented
UA0166 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,666 $38,071 Implemented
UA0166 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $617 $200 Implemented
UA0166 # 05 Y:2016 05 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,707 $120 Implemented
UA0166 # 04 Y:2016 04 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,642 $59,120 Not Implemented
UA0166 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,248 $80 Implemented
UA0166 # 01 Y:2016 01 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $93,758 $199,325 Not Implemented
IA0545 # 01 Y:2015 01 2015 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $37,834 $27,000 Implemented
IA0545 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,509 $115,341 Implemented
IA0545 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $9,979 $4,778 Not Implemented
IA0545 # 04 Y:2015 04 2015 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,172 $620 Implemented
IA0545 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,267 $4,620 Implemented
IA0545 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $231 $292 Implemented