IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 8113 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0243 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $2,255 Implemented
MI0243 # 09 Y:2013 09 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,638 $793 Implemented
MI0243 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,653 $80 Implemented
MI0243 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,219 $1,660 Implemented
MI0243 # 03 Y:2013 03 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,984 $19,999 Implemented
MI0243 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,601 $80 Implemented
MI0243 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $24,158 $2,300 Implemented
LL0363 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $6,400 Implemented
LL0363 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $3,325 Implemented
LL0363 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $1,200 Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MI0167 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $53,872 $3,640 Implemented
MI0167 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $48,995 $132,686 Implemented
MI0167 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $27,111 $61,964 Implemented
MI0167 # 04 Y:2008 04 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,032 $5,700 Implemented
MI0167 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,393 $1,210 Implemented
MI0167 # 06 Y:2008 06 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,627 $15,500 Implemented
MA0617 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,016 $0 Implemented
MA0617 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,068 $24,034 Implemented
MA0617 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,579 $2,348 Implemented