IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 8113 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0243 # 12 Y:2013 12 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $513 $1,128 Not Implemented
MI0243 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $2,255 Implemented
MI0243 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $1,228 $417 Not Implemented
MI0243 # 09 Y:2013 09 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,638 $793 Implemented
MI0243 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,653 $80 Implemented
MI0243 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,047 $10,080 Not Implemented
MI0243 # 06 Y:2013 06 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,831 $440 Not Implemented
MI0243 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,219 $1,660 Implemented
MI0243 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,171 $9,782 Not Implemented
MI0243 # 03 Y:2013 03 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,984 $19,999 Implemented
MI0243 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,601 $80 Implemented
MI0243 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $24,158 $2,300 Implemented
LL0363 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $6,400 Implemented
LL0363 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $1,200 Implemented
LL0363 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $3,325 Implemented
LL0363 # 04 Y:2012 04 2012 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,323 $420 Not Implemented
LL0363 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $455 $960 Not Implemented
LL0363 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $269 $368 Not Implemented
MA0646 # 01 Y:2009 01 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,158 $8,683 Not Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $3,610 Not Implemented
MA0646 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,450 $5,195 Not Implemented
MI0167 # 06 Y:2008 06 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,627 $15,500 Implemented
MI0167 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,393 $1,210 Implemented