IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 142 Crushed And Broken Stone
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0467 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,647 $223,755 Implemented
SF0467 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,388 $5,977 Implemented
SF0467 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,324 $4,543 Implemented
SF0467 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $12,922 $8,500 Not Implemented
SF0467 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,437 $0 Implemented
SF0467 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,119 $0 Implemented
SF0467 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $522 $2,846 Implemented
TT0042 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,600 $28,400 Implemented
TT0042 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $16,800 $2,900 Implemented
TT0042 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $20,000 Not Implemented
SD0384 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,082 $13,481 Not Implemented
SD0384 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Not Implemented
SD0384 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $5,792 Not Implemented
SD0384 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,354 $45,825 Not Implemented
SD0384 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $184,174 $85,865 Not Implemented
SD0384 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $199,400 $80,665 Not Implemented
BD0312 # 02 Y:2006 02 2006 USE SYNTHETIC LUBRICANT $16,661 $10,500 Not Implemented
BD0312 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,668 $0 Not Implemented
BD0312 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $61,556 $162,010 Not Implemented
MI0030 # 01 Y:2002 01 2002 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $113,786 $15 Implemented
MI0030 # 02 Y:2002 02 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $70,800 $7,140 Implemented
MI0030 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,323 $962 Not Implemented
MI0030 # 04 Y:2002 04 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,368 $4,260 Not Implemented
MI0030 # 05 Y:2002 05 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,370 $2,730 Not Implemented