IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,847

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0579 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,704 $2,300 Implemented
LE0579 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,555 $510 Implemented
LE0579 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,804 $49,222 Implemented
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 Implemented
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 Implemented
UW2409 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $240,871 $7,750 Implemented
UW2409 # 05 Y:2024 05 2024 REPLACE BOILER $61,679 $155,400 Implemented
UW2409 # 07 Y:2024 07 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $24,670 $223,625 Implemented
UW2409 # 03 Y:2024 03 2024 TREAT AND REUSE RINSE WATERS $1,034,601 $300,000 Implemented
UW2409 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $1,927 $2,080 Implemented
UW2409 # 04 Y:2024 04 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $16,446 $18,600 Implemented
UW2409 # 06 Y:2024 06 2024 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $72,261 $271,830 Implemented
LS2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $135 Implemented
LS2412 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $5,915 Implemented
LS2411 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,136 $480,000 Implemented
LS2411 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,962 $12,050 Implemented
LS2411 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $45 Implemented
LT8400 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,040 $26,888 Implemented
IC0303 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $3,324 $1,624 Implemented
IC0303 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,164 $0 Implemented
IC0303 # 05 Y:2024 05 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $31,214 $13,640 Implemented
IC0303 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,438 $3,433 Implemented
IC0303 # 16 Y:2024 16 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $74,328 $441,248 Implemented
LS2408 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,002 $144,549 Implemented
MI0440 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,491 $1,720 Implemented