IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,728

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0208 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $137,714 $144,177 Implemented
CO0562 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $240 Implemented
CO0562 # 04 Y:2005 04 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $150 $120 Implemented
CO0562 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,530 $2,350 Implemented
CO0562 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $430 Implemented
LL0221 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,226 $1,500 Implemented
LL0221 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $250 Implemented
LL0221 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $31,870 $800 Implemented
LL0217 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,879 $1,500 Implemented
LL0217 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,756 $1,750 Implemented
LL0217 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $816 $30 Implemented
CO0559 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,070 $440 Implemented
CO0559 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $416 Implemented
CO0559 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,190 $740 Implemented
CO0559 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,180 $810 Implemented
CO0559 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $710 $1,790 Implemented
CO0559 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,760 $2,260 Implemented
CO0559 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $292 Implemented
SU0206 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,139 $1,148 Implemented
SU0206 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,234 $1,352 Implemented
SU0206 # 04 Y:2005 04 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $255,262 $207,240 Implemented
MI0101 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,178 $180 Implemented
MI0101 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,200 $6,660 Implemented
MI0101 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,386 $1,030 Implemented
OR0479 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $116,320 $115,000 Implemented