IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,728

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0019 # 04 Y:2002 04 2002 USE OPTIMUM THICKNESS INSULATION $8,790 $2,670 Implemented
UU0019 # 06 Y:2002 06 2002 ISOLATE HOT OR COLD EQUIPMENT $12,399 $22,269 Implemented
UU0019 # 07 Y:2002 07 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,878 $6,350 Implemented
MI0029 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,287 $1,550 Implemented
MI0029 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,657 $2,122 Implemented
MI0029 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,668 $3 Implemented
LM0027 # 03 Y:2002 03 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $12,600 $1,000 Implemented
AS0294 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,070 Implemented
AS0294 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,366 $6,076 Implemented
AS0294 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,492 $15,000 Implemented
OK0634 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $2,496 $823 Implemented
OK0634 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $2,910 $4,125 Implemented
OK0634 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $218 $255 Implemented
OK0634 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,679 Implemented
OK0634 # 08 Y:2002 08 2002 UPGRADE CONTROLS ON COMPRESSORS $7,297 $1,028 Implemented
OK0634 # 10 Y:2002 10 2002 REPAIR OR REPLACE STEAM TRAPS $33,934 $525 Implemented
UF0291 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,755 $1,050 Implemented
UF0291 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,917 $6,752 Implemented
UF0291 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,067 $40,280 Implemented
UF0291 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $1,124 $450 Implemented
UF0291 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,424 $490 Implemented
UF0291 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,235 $25,190 Implemented
UF0291 # 11 Y:2002 11 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $4,387 $0 Implemented
UF0291 # 12 Y:2002 12 2002 METER WASTE WATER $4,133 $1,500 Implemented
UF0289 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,791 $2,728 Implemented