IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0782 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,302 $41,745 Implemented
SF0609 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,467 $66,447 Implemented
SF0609 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,617 $36,367 Implemented
SF0609 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $2,155 Implemented
SF0609 # 03 Y:2023 03 2023 USE OPTIMUM THICKNESS INSULATION $1,473 $338 Implemented
SF0609 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,389 $1,640 Implemented
SF0609 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,048 $1,594 Implemented
LS2320 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $24,628 $171,600 Implemented
LS2320 # 01 Y:2023 01 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,364 $0 Implemented
LS2320 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,333 $1,369 Implemented
LS2319 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $307 $230 Implemented
OR0780 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,517 $2,000 Implemented
DL0228 # 01 Y:2023 01 2023 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $4,024 $700 Implemented
DL0228 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,279 $0 Implemented
SF0608 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,597 $29,794 Implemented
SF0608 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,235 $4,654 Implemented
SF0608 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,050 $0 Implemented
SF0608 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $29,842 $690 Implemented
SF0608 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,322 $0 Implemented
SF0608 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $16,747 $400 Implemented
UU0229 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,527 $5,600 Implemented
UU0229 # 03 Y:2023 03 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,945 $3,480 Implemented
UU0229 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $2,146 $3,060 Implemented
OR0777 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,479 $0 Implemented
OR0777 # 02 Y:2023 02 2023 INSTALL COMMON HEADER ON COMPRESSORS $2,832 $6,989 Implemented