Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
187
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1406 # 02 Y:2014 | 02 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $20,868 | $60,000 | Implemented |
UK1406 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,015 | $700 | Implemented |
UK1406 # 11 Y:2014 | 11 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $100 | $90 | Implemented |
UK1406 # 10 Y:2014 | 10 | 2014 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $612 | $2,154 | Implemented |
UK1406 # 09 Y:2014 | 09 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,736 | $2,479 | Implemented |
UK1406 # 08 Y:2014 | 08 | 2014 | ADD AREA LIGHTING SWITCHES | $1,572 | $620 | Implemented |
UK1406 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,190 | $0 | Implemented |
UK1406 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $13,621 | $15,000 | Implemented |
UK1406 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $930 | $1,845 | Implemented |
UK1406 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $18,647 | $49,610 | Implemented |
UK1406 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $84,218 | $192,800 | Implemented |
UK1405 # 10 Y:2014 | 10 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,374 | $24,100 | Implemented |
UK1405 # 04 Y:2014 | 04 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $32,296 | $39,600 | Implemented |
UK1405 # 06 Y:2014 | 06 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $27,426 | $2,678 | Implemented |
UK1405 # 07 Y:2014 | 07 | 2014 | OPTIMIZE PLANT POWER FACTOR | $20,457 | $15,610 | Implemented |
UK1405 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,745 | $46,464 | Implemented |
UK1405 # 14 Y:2014 | 14 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $103 | $30 | Implemented |
UK1405 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,146 | $1,540 | Implemented |
UK1405 # 12 Y:2014 | 12 | 2014 | INSULATE FEEDWATER TANK | $3,480 | $1,769 | Implemented |
UD0884 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,058 | $500 | Implemented |
UD0884 # 07 Y:2013 | 07 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,470 | $0 | Implemented |
UD0884 # 08 Y:2013 | 08 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,876 | $0 | Implemented |
UD0884 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,533 | $2,000 | Implemented |
UD0884 # 12 Y:2013 | 12 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,101 | $0 | Implemented |
UD0884 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,400 | $19,000 | Implemented |