IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0633 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,338 $500 Implemented
SD0633 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $219,112 $395,439 Implemented
SD0633 # 07 Y:2023 07 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,972 $66,845 Implemented
SD0633 # 08 Y:2023 08 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $102,944 $0 Implemented
GT0965 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,014 $1,850 Implemented
GT0965 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,164 $800 Implemented
GT0965 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $927 Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
MI0420 # 04 Y:2023 04 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,620 $52,100 Implemented
MI0420 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $15,797 $0 Implemented
MI0420 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,309 $1,980 Implemented
MI0420 # 09 Y:2023 09 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,456 $280 Implemented
MI0420 # 10 Y:2023 10 2023 PAY UTILITY BILLS ON TIME $111 $0 Implemented
TT0290 # 01 Y:2023 01 2023 UPGRADE OBSOLETE EQUIPMENT $106,623 $200,000 Implemented
TT0290 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,755 Implemented
TT0290 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $911 $30 Implemented
TT0290 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $1,150 Implemented
SF0598 # 01 Y:2023 01 2023 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $10,131 $0 Implemented
SF0598 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,805 $1,551 Implemented
SF0598 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,883 $23,100 Implemented
SF0598 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,843 $8,505 Implemented
LE0543 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $839 $100 Implemented
LE0543 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,298 $8,400 Implemented
LE0543 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $210 $760 Implemented
LE0543 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,200 $9,000 Implemented