Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,751
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0136 # 01 Y:2014 | 01 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,626 | $290 | Implemented |
MZ0136 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $672 | $1,600 | Implemented |
MZ0136 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $282 | $50 | Implemented |
MZ0136 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,785 | $18,300 | Implemented |
MZ0136 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $16,863 | $910 | Implemented |
UD0899 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $0 | Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |
UD0899 # 06 Y:2014 | 06 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,303 | $0 | Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |
SD0481 # 01 Y:2014 | 01 | 2014 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $134,111 | $80,720 | Implemented |
SD0481 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $36,872 | $91,000 | Implemented |
SD0481 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,839 | $1,000 | Implemented |
SD0481 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,116 | $2,600 | Implemented |
SD0481 # 06 Y:2014 | 06 | 2014 | MAINTAIN MACHINES TO REDUCE LEAKS | $14,877 | $5,000 | Implemented |
SD0481 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,167 | $16,320 | Implemented |
SD0481 # 08 Y:2014 | 08 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $2,220 | $1,200 | Implemented |
SD0481 # 09 Y:2014 | 09 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,553 | $2,325 | Implemented |
OK0875 # 05 Y:2014 | 05 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,420 | $2,400 | Implemented |
OK0875 # 06 Y:2014 | 06 | 2014 | MINIMIZE WATER USAGE | $19,960 | $800 | Implemented |
OK0875 # 07 Y:2014 | 07 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,065 | $15 | Implemented |
BS0028 # 01 Y:2014 | 01 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,764 | $1,960 | Implemented |
BS0028 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,219 | $7,950 | Implemented |
BS0028 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,895 | $15,396 | Implemented |
BS0028 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,837 | $449 | Implemented |
BS0028 # 05 Y:2014 | 05 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $60,962 | $13,425 | Implemented |