IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0394 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,794 $20,780 Implemented
SF0394 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $7,621 $11,002 Implemented
SF0394 # 04 Y:2011 04 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,879 $3,638 Implemented
SF0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $2,952 $3,821 Implemented
SF0394 # 02 Y:2011 02 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $439 $235 Implemented
SF0394 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,204 $73 Implemented
SF0394 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $700 Implemented
SF0393 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,408 $720 Implemented
SF0393 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $3,016 $14,478 Implemented
SF0393 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,350 $25,921 Implemented
SF0393 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $6,132 $17,178 Implemented
SF0393 # 07 Y:2011 07 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,171 $34,310 Implemented
SF0393 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,385 $4,330 Implemented
SF0393 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $99,396 $33,822 Implemented
SF0364 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
SF0364 # 15 Y:2008 15 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,376 $28,462 Implemented
SF0364 # 14 Y:2008 14 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,306 $125,074 Implemented
SF0364 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,909 $2,854 Implemented
SF0364 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $409 $801 Implemented
SF0364 # 10 Y:2008 10 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $6,734 $8,900 Implemented
SF0364 # 09 Y:2008 09 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $9,060 $11,740 Implemented
SF0364 # 06 Y:2008 06 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $85,730 $61,250 Implemented
SF0364 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,655 $798 Implemented
SF0364 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,974 $913 Implemented
SF0364 # 02 Y:2008 02 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,812 $1,046 Implemented