Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
626
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0899 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,635 | $3,920 | Not Implemented |
UD0880 # 01 Y:2013 | 01 | 2013 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $37,553 | $100,000 | Not Implemented |
UD0880 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,784 | $5,000 | Implemented |
UD0880 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,581 | $15,000 | Implemented |
UD0880 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,196 | $3,400 | Implemented |
UD0880 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,656 | $0 | Implemented |
UD0880 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $12,462 | $0 | Implemented |
UD0880 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,000 | Implemented |
UD0880 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $35,463 | $15,000 | Implemented |
UD0880 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,120 | $4,600 | Implemented |
UD0880 # 10 Y:2013 | 10 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,091 | $25,000 | Implemented |
UD0880 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,315 | $8,000 | Implemented |
UD0880 # 12 Y:2013 | 12 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,170 | $8,000 | Implemented |
UD0880 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $3,572 | $1,221 | Implemented |
UD0880 # 14 Y:2013 | 14 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,352 | $0 | Implemented |
UD0880 # 15 Y:2013 | 15 | 2013 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,830 | $0 | Implemented |
UD0877 # 01 Y:2013 | 01 | 2013 | ELIMINATE THIRD SHIFT | $75,782 | $0 | Implemented |
UD0877 # 02 Y:2013 | 02 | 2013 | METER WASTE WATER | $18,660 | $1,000 | Implemented |
UD0877 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,981 | $14,250 | Not Implemented |
UD0877 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,143 | $8,200 | Not Implemented |
UD0877 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,183 | $1,000 | Not Implemented |
UD0877 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,095 | $0 | Implemented |
UD0877 # 07 Y:2013 | 07 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $262 | $500 | Not Implemented |
UD0877 # 08 Y:2013 | 08 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $61,182 | $25,000 | Implemented |
UD0877 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $685 | $2,000 | Implemented |