IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0461 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $651 Not Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 05 Y:2018 05 2018 REPLACE BOILER $10,937 $22,000 Not Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
SF0524 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,926 $0 Implemented
SF0524 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $412 $0 Implemented
SF0524 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,541 $798 Implemented
SF0524 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,704 $208 Implemented
SF0524 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $463 $378 Implemented
SF0524 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,866 $17,240 Implemented
SF0524 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,992 $9,121 Not Implemented
SF0524 # 08 Y:2018 08 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,328 $27,411 Not Implemented
SF0524 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,150 $0 Implemented
SF0524 # 10 Y:2018 10 2018 ADOPT IN-HOUSE MATERIAL GENERATION $29,406 $113,992 Not Implemented
UA0195 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $186,843 $100,000 Not Implemented
UA0195 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,429 $11,536 Implemented
UA0195 # 03 Y:2018 03 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,189 $19,100 Not Implemented
UA0195 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,476 $500 Implemented
UA0195 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,589 $2,465 Implemented
UA0195 # 06 Y:2018 06 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,967 $70,000 Not Implemented
SF0522 # 01 Y:2018 01 2018 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $148,377 $0 Not Implemented
SF0522 # 02 Y:2018 02 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,924 $0 Not Implemented
SF0522 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,732 $560 Not Implemented
SF0522 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,705 $0 Implemented