IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

312

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0238 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,223 $1,000 Not Implemented
LE0238 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,471 $2,500 Not Implemented
LE0238 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,065 $90 Implemented
LE0216 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,847 $1,200 Not Implemented
LE0216 # 02 Y:2005 02 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,467 $4,000 Not Implemented
LE0216 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,748 $2,000 Not Implemented
LE0216 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $320 Not Implemented
LE0216 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $429 $200 Not Implemented
LE0216 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,078 $110 Not Implemented
LE0216 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,315 $40,077 Not Implemented
LE0199 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,230 $16,000 n/a
LE0199 # 02 Y:2004 02 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,780 $15,000 Not Implemented
LE0199 # 03 Y:2004 03 2004 INSULATE FEEDWATER TANK $8,188 $2,220 Implemented
LE0199 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $300 Implemented
LE0199 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,019 $1,884 Not Implemented
LE0151 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,947 $3,000 Implemented
LE0151 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,069 $0 Not Implemented
LE0151 # 03 Y:2003 03 2003 USE OPTIMUM THICKNESS INSULATION $51,426 $6,735 Implemented
LE0151 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $7,733 $1,000 Not Implemented
LE0151 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,064 $4,425 Implemented
LE0151 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,947 $0 Not Implemented
LE0151 # 07 Y:2003 07 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,270 $0 Not Implemented
LE0151 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,121 $1,000 Implemented
HO0155 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,138 $9,401 Not Implemented
HO0155 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,489 $1,607 Implemented