Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1904 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,231 | $10,000 | Not Implemented |
LS1904 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,763 | $45,810 | Implemented |
LS1904 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,052 | $20,000 | Not Implemented |
SF0533 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,552 | $0 | Implemented |
SF0533 # 02 Y:2019 | 02 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $5,167 | $1,440 | Implemented |
SF0533 # 03 Y:2019 | 03 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $39,996 | $12,500 | Not Implemented |
SF0533 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,254 | $4,129 | Implemented |
SF0533 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,489 | $4,651 | Implemented |
SF0533 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,888 | $3,120 | Implemented |
SF0533 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $292 | $163 | Implemented |
SF0533 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,088 | $25,965 | Implemented |
SF0533 # 09 Y:2019 | 09 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,925 | $3,138 | Implemented |
SF0533 # 10 Y:2019 | 10 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,765 | $2,729 | Implemented |
SF0533 # 11 Y:2019 | 11 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,111 | $11,016 | Implemented |
SF0533 # 12 Y:2019 | 12 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,093 | $93,629 | Implemented |
LS1903 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,079 | $150 | Not Implemented |
LS1903 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $135 | $0 | Implemented |
LS1903 # 03 Y:2019 | 03 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $839 | $0 | Implemented |
LS1903 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $480 | $240 | Not Implemented |
LS1903 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45 | $0 | Implemented |
LS1903 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,445 | $2,189 | Not Implemented |
UD0995 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $3,767 | $0 | Not Implemented |
UD0995 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,443 | $1,500 | Implemented |
UD0995 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $5,974 | $1,800 | Implemented |
UD0995 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,159 | $3,500 | Implemented |