IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1904 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $20,231 $10,000 Not Implemented
LS1904 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,763 $45,810 Implemented
LS1904 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,052 $20,000 Not Implemented
SF0533 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $10,552 $0 Implemented
SF0533 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,167 $1,440 Implemented
SF0533 # 03 Y:2019 03 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,996 $12,500 Not Implemented
SF0533 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,254 $4,129 Implemented
SF0533 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,489 $4,651 Implemented
SF0533 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,888 $3,120 Implemented
SF0533 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $163 Implemented
SF0533 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,088 $25,965 Implemented
SF0533 # 09 Y:2019 09 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,925 $3,138 Implemented
SF0533 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,765 $2,729 Implemented
SF0533 # 11 Y:2019 11 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,111 $11,016 Implemented
SF0533 # 12 Y:2019 12 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,093 $93,629 Implemented
LS1903 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,079 $150 Not Implemented
LS1903 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $135 $0 Implemented
LS1903 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $839 $0 Implemented
LS1903 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $480 $240 Not Implemented
LS1903 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $45 $0 Implemented
LS1903 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,445 $2,189 Not Implemented
UD0995 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $3,767 $0 Not Implemented
UD0995 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,443 $1,500 Implemented
UD0995 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $5,974 $1,800 Implemented
UD0995 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,159 $3,500 Implemented