IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0460 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $190 $375 Implemented
IP0108 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,011 $0 Not Implemented
IP0108 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $4 Not Implemented
IP0108 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,119 $600 Not Implemented
IP0108 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,230 $339 Not Implemented
IP0108 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,465 $322 Not Implemented
IP0108 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $6,000 $3,479 Not Implemented
IP0108 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $115 $53 Not Implemented
IP0108 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,022 Not Implemented
IP0108 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,070 $2,129 Not Implemented
IP0108 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,909 $19,975 Not Implemented
IP0108 # 11 Y:2018 11 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $352 $1,323 Not Implemented
IP0108 # 12 Y:2018 12 2018 OPTIMIZE PLANT POWER FACTOR $864 $4,146 Not Implemented
WM0126 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $95,648 $66,000 Not Implemented
WM0126 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $26,985 $20,000 Not Implemented
WM0126 # 03 Y:2018 03 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $14,198 $48,500 Not Implemented
WM0126 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,475 $8,650 Not Implemented
WM0126 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,236 Implemented
WM0126 # 06 Y:2018 06 2018 REPAIR OR REPLACE STEAM TRAPS $7,154 $6,480 Implemented
WM0126 # 07 Y:2018 07 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,029 $1,710 Not Implemented
WM0126 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,101 $2,850 Not Implemented
WM0126 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,864 $0 Not Implemented
IC0207 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,822 $7,531 Not Implemented
IC0207 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $13,820 Not Implemented
IC0207 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,822 $290 Not Implemented