Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,693
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0522 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,732 | $560 | Not Implemented |
SF0522 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,705 | $0 | Implemented |
SF0522 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,703 | $630 | Not Implemented |
SF0522 # 06 Y:2018 | 06 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,306 | $1,047 | Implemented |
SF0522 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,281 | $52,606 | Not Implemented |
SF0522 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $213,278 | $289,618 | Implemented |
SF0522 # 09 Y:2018 | 09 | 2018 | INSULATE BARE EQUIPMENT | $947 | $1,332 | Not Implemented |
SF0522 # 10 Y:2018 | 10 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $14,838 | $29,848 | Implemented |
SF0522 # 11 Y:2018 | 11 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $113,493 | $259,859 | Not Implemented |
SF0522 # 12 Y:2018 | 12 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,563 | $26,446 | Not Implemented |
SF0522 # 13 Y:2018 | 13 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $38,069 | $123,450 | Not Implemented |
SF0522 # 14 Y:2018 | 14 | 2018 | ADOPT IN-HOUSE MATERIAL GENERATION | $348,148 | $1,184,880 | Not Implemented |
TR0008 # 01 Y:2018 | 01 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,536 | $3,860 | Implemented |
TR0008 # 02 Y:2018 | 02 | 2018 | INSULATE BARE EQUIPMENT | $692 | $602 | Not Implemented |
TR0008 # 03 Y:2018 | 03 | 2018 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $28,264 | $975 | Implemented |
TR0008 # 04 Y:2018 | 04 | 2018 | MAINTAIN MACHINES TO REDUCE LEAKS | $13,889 | $1,000 | Implemented |
TR0008 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $2,128 | Implemented |
TR0008 # 06 Y:2018 | 06 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,464 | $0 | Not Implemented |
SF0520 # 01 Y:2018 | 01 | 2018 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $3,418 | $136 | Not Implemented |
SF0520 # 02 Y:2018 | 02 | 2018 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,652 | $800 | Implemented |
SF0520 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,563 | $136 | Implemented |
SF0520 # 04 Y:2018 | 04 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,469 | $4,039 | Implemented |
SF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,296 | $8,179 | Implemented |
SF0520 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $942 | $900 | Implemented |
SF0520 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,938 | $24,858 | Implemented |