Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0131 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,471 | $39,272 | Implemented |
UU0131 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $17,732 | $2,030 | Implemented |
UU0131 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,477 | $150 | Implemented |
UU0131 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $6,501 | $2,665 | Not Implemented |
UU0131 # 07 Y:2018 | 07 | 2018 | INSTALL REPLACEMENT DOORS | $4,539 | $300 | Implemented |
UF0515 # 01 Y:2018 | 01 | 2018 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $293,173 | $1,270,000 | Not Implemented |
UF0515 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,829 | $63,355 | Implemented |
UF0515 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,104 | $23,300 | Implemented |
UF0515 # 04 Y:2018 | 04 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $11,421 | $29,224 | Implemented |
UF0515 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,553 | $2,800 | Implemented |
UF0515 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $512 | Implemented |
NL0020 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,414 | $29,401 | Implemented |
NL0020 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $1,869 | $56 | Implemented |
NL0020 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $543 | $2,476 | Not Implemented |
NL0020 # 04 Y:2018 | 04 | 2018 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $81 | $200 | Implemented |
SF0516 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,768 | $350 | Implemented |
SF0516 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $300 | Implemented |
SF0516 # 03 Y:2018 | 03 | 2018 | USE MINIMUM STEAM OPERATING PRESSURE | $875 | $200 | Implemented |
SF0516 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $653 | $187 | Not Implemented |
SF0516 # 05 Y:2018 | 05 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $488 | $200 | Implemented |
SF0516 # 06 Y:2018 | 06 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $906 | $468 | Implemented |
SF0516 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $32,827 | $20,000 | Implemented |
SF0516 # 08 Y:2018 | 08 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,367 | $15,956 | Implemented |
SF0516 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,509 | $36,186 | Implemented |
SF0516 # 10 Y:2018 | 10 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,989 | $48,803 | Not Implemented |