IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0411 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,377 $6,300 Implemented
OR0411 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,746 $0 Implemented
OR0354 # 01 Y:1999 01 1999 CLOSE OFF UNNEEDED STEAM LINES $5,250 $950 Implemented
OR0354 # 02 Y:1999 02 1999 USE MINIMUM STEAM OPERATING PRESSURE $560 $0 Not Implemented
OR0354 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $750 $500 Implemented
OR0354 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $2,049 Implemented
OR0354 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $950 $0 Not Implemented
OR0351 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,756 $0 Not Implemented
OR0351 # 02 Y:1999 02 1999 AVOID FROST FORMATION ON EVAPORATORS $31,270 $48,000 Not Implemented
OR0351 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,590 $0 Implemented
OR0351 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,270 $3,100 Not Implemented
OR0351 # 05 Y:1999 05 1999 OPTIMIZE PLANT POWER FACTOR $1,595 $9,600 Not Implemented
OR0315 # 01 Y:1998 01 1998 UPGRADE CONTROLS ON COMPRESSORS $6,113 $4,480 Implemented
OR0315 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $1,000 Implemented
OR0315 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $934 $0 Not Implemented
OR0315 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,040 $2,700 Not Implemented
OR0315 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,591 $4,176 Not Implemented
OR0315 # 06 Y:1998 06 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $2,120 $0 Not Implemented
OR0315 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $674 $3,200 Not Implemented
OR0302 # 01 Y:1997 01 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $370,800 $345,000 Not Implemented
OR0302 # 02 Y:1997 02 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $78,667 $5,000 Implemented
OR0302 # 03 Y:1997 03 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $25,630 $73,000 Implemented
OR0302 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,448 $130,000 Implemented
OR0302 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,141 $8,464 Implemented
OR0302 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,613 $1,000 Not Implemented