IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0562 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,513 $320 n/a
LE0562 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,612 $350 n/a
LE0562 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,865 $27,000 n/a
LE0562 # 04 Y:2024 04 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,836 $5,000 n/a
LE0562 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $727 $1,000 n/a
LE0562 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,738 $13,669 n/a
LE0562 # 07 Y:2024 07 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,491 $8,000 n/a
LE0562 # 08 Y:2024 08 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,989 $60,600 n/a
CC0035 # 01 Y:2024 01 2024 USE HEAT PUMP FOR SPACE CONDITIONING $1,534 $7,000 n/a
CC0035 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,395 $4,578 n/a
CC0035 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,484 $1,000 n/a
CC0035 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,601 $4,550 n/a
CC0035 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,795 $2,800 n/a
CC0035 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,865 $0 n/a
IC0302 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,001 $2,566 n/a
IC0302 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $1,256 n/a
IC0302 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $411 $0 n/a
IC0302 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $376 $0 n/a
IC0302 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,613 $0 n/a
IC0302 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,025 $350 n/a
IC0302 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $320 $0 n/a
IC0302 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,385 $1,118 n/a
IC0302 # 09 Y:2024 09 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,215 $4,414 n/a
IC0302 # 10 Y:2024 10 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,478 $12,801 n/a
UD1079 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $338 $0 n/a