IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

626

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0805 # 10 Y:2009 10 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,119 $0 Implemented
UD0805 # 11 Y:2009 11 2009 INSULATE BARE EQUIPMENT $3,797 $4,283 Implemented
UD0805 # 12 Y:2009 12 2009 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,741 $0 Not Implemented
UD0805 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,689 $0 Implemented
UD0805 # 14 Y:2009 14 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,965 $0 Implemented
UD0805 # 15 Y:2009 15 2009 OPTIMIZE PLANT POWER FACTOR $1,903 $5,000 Not Implemented
UD0805 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,428 $1,000 Implemented
UD0805 # 17 Y:2009 17 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,423 $0 Not Implemented
UD0805 # 18 Y:2009 18 2009 ISOLATE HOT OR COLD EQUIPMENT $666 $0 Implemented
UD0785 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $199,480 $23,400 Not Implemented
UD0785 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $66,859 $121,500 Implemented
UD0785 # 03 Y:2008 03 2008 REPLACE BOILER $54,105 $88,560 Not Implemented
UD0785 # 04 Y:2008 04 2008 COVER OPEN TANKS $13,767 $55,000 Not Implemented
UD0785 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $98,908 Implemented
UD0785 # 06 Y:2008 06 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,484 $640 Not Implemented
UD0785 # 07 Y:2008 07 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,742 $5,924 Implemented
UD0785 # 08 Y:2008 08 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $0 Not Implemented
UD0785 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $3,317 $4,500 Not Implemented
UD0785 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 Implemented
UD0785 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,180 $0 Not Implemented
UD0763 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,135 $5,242 Implemented
UD0763 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,994 $8,900 Implemented
UD0763 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,945 $57,910 Not Implemented
UD0763 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,551 $8,100 Not Implemented
UD0763 # 05 Y:2007 05 2007 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,275 $0 Not Implemented